Your Construction Technology Provider

Finning Worldwide Locations

Business Center - HCE Patch (Version 2.50.3)

Please hit the update button on your start page of your Business Center HCE to download updated program files that include these fixes:

  • Reporting site improvement quantities was improved to handle cases where the site improvement contains loops.
  • Reporting earthwork volumes now works for a rare case that caused the isopach created by the Earthwork Report to be formed incorrectly.
  • Exporting a job site design road surface model (through Terramodel as a .pro file) for use in SCS900 now works properly. This only occurred when the surface was defined by cross-sections that had vertical segments and the project units were meters.

This patch also includes these previous fixes from the BC-HCE 2.50.1 and 2.50.2 patches:

  • The Area/Length/Count Report now correctly counts the features of points that contain multiple processed features.
  • When your project units are set to Feet, the areas and lengths in the Area/Length/Count Report are now in those units when output to Microsoft Excel or comma-separated value files (.csv).
  • The isopach created by the Earthwork Report now forms correctly for a rare case that caused reported volumes to be inaccurate.
  • The Project Cleanup command no longer reports an error for certain projects/data types.
  • The REB importer no longer creates duplicate alignments when the imported data includes a vertical alignment.
  • The As-Staked Report now displays correct design elevations.
  • You can now make successive edits to a feature code in the Points Spreadsheet.
  • The Antenna.ini file has been updated (version 7.28).
  • The Receiver.ini file has been updated (version 4.89).

Corrections for the rare cases in which:

  • Surface contours did not cover the entire surface when you edited their intervals.
  • A corridor surface did not tie to an original ground surface when using the Side Slope corridor template instruction.